_DSC0836-HDR
_MGL1490
_MGL1516
_MGL9393
KRAFT HEINZ realizacja Interbiuro fot Szymon Polanski-0206
R25A9015_large
VW Warszawa realizacja INTER BIURO fot Szymon Polanski-6259
previous arrow
next arrow

We make arrangements at Mazowiecka 2/4

mazowiecka office 250x141 - We make arrangements at Mazowiecka 2/4Interbiuro is in the process of making arrangements of office space with a total area of 1500 m2, localised at three floors of the office and service building at Mazowiecka 2/4.

 

Division of space – of the open-space type, for offices and office rooms, and separation of conference rooms from the lift lobby area have been designed as a part of investment for New Work Offices, the lessee. The works involve building new partition walls, alteration of dropped ceilings, alteration and regulation of ventilation system, alteration of electrical wiring system. The floor plan is repeatable at the floors included in the scope.

 

The investment is performed directly for New Work Offices, with the supervision from Savills. Duration – 17 weeks.

 

The project has been drawn up by KJ Architekt.