_DSC0836-HDR
_MGL1490
_MGL1516
_MGL9393
KRAFT HEINZ realizacja Interbiuro fot Szymon Polanski-0206
R25A9015_large
VW Warszawa realizacja INTER BIURO fot Szymon Polanski-6259
previous arrow
next arrow

BZWBK Wrocław / Silver Forum

Area: approx. 10340m2
The scope of work:
– construction and execution design
– removal of elements of gypsum – cardboard and glass partitions
– conversion of ceilings on a part of the surface to the metal Open Cell ceiling of the Barwa System
– together with the lighting installation
– replacement of the floor covering
– modernization of electrical, water and sewage and  air-conditioning installations

System
– together with the lighting installation
– replacement of the floor covering
– modernization of electrical, water and sewage and  air-conditioning installations

 

BZWBK Wrocław / Silver Forum realizacja INTERBIURO
BZWBK Wrocław / Silver Forum realizacja INTERBIURO
BZWBK Wrocław / Silver Forum realizacja INTERBIURO
BZWBK Wrocław / Silver Forum realizacja INTERBIURO
BZWBK Wrocław / Silver Forum realizacja INTERBIURO
BZWBK Wrocław / Silver Forum realizacja INTERBIURO
BZWBK Wrocław / Silver Forum realizacja INTERBIURO
BZWBK Wrocław / Silver Forum realizacja INTERBIURO
BZWBK Wrocław / Silver Forum realizacja INTERBIURO
BZWBK Wrocław / Silver Forum realizacja INTERBIURO
BZWBK Wrocław / Silver Forum realizacja INTERBIURO