_DSC0836-HDR
_MGL1490
_MGL1516
_MGL9393
KRAFT HEINZ realizacja Interbiuro fot Szymon Polanski-0206
R25A9015_large
VW Warszawa realizacja INTER BIURO fot Szymon Polanski-6259
previous arrow
next arrow

Fit out in the Astoria building

astoria 250x250 - Fit out in the Astoria buildingAt the end of September, the company started arranging works in the ASTORIA building, for the Seachange tenant. On the area of approximately 350 m2 of builders finish, Interbiuro launched preparations to works connected with the partition of the surface with both gypsum plasterboards and glass walls;  at the same time proceeding with assembling the modular ceiling in the corridor area and island ceilings in the open space. The scope of work also includes the distribution of ventilation, water and sewerage systems, electrical & telecommunication installations as well as SAP / DSO installations. The design for this arrangement is a continuation of the already existing tenant’s office, which is directly adjacent to the new space where Interbiuro is currently conducting works. The architect designed many decorative elements to improve the aesthetic as well as acoustic qualities. The completion date is scheduled for the end of November.