Fit-out at Cosmopolitan

cosmopolitanIn mid July we completed a 235 sq m fit-out on the 4th floor of the Cosmopolitan building at 2 Twarda Street in Warsaw.

The scope of work included a comprehensive implementation of the Shell&core standard. The following works included: plasterboard walls, painting ceilings together with the installations, wall paintings, carpentry and door joinery, carpeting, construction of a complete ventilation and air conditioning adapted to new interior arrangement, adaptation of the existing sprinkler system for interior arrangement, installation of lighting, power supply and structured wiring.

interbiuro has written 125 articles